*WE ARE LOOKING FOR AN INVESTOR FOR MERSIN GREEN HYDROGEN PLANT PROJECT*

LOCATION.  *MERSIN TURKEY*
 
1.    PROJECT OWNER:EURASIA-ENPETROL
2.    PROJECT CONSULTANT:PAKPAS
3.    PROJECT EPC WORK OF STAGE-1 (SOLAR-PV) PAKPAS-ENPETROL CONSORTIUM
4.    EPC WORK OF STAGE-2, GREEN HYDROGEN: ANDRITZ
5.    EPC WORK OF STAGE-2, GREEN HYDROGEN LOCAL WORKS, PAKPAS-ENPETROL CONSORTIUM
THESE PROJECT DIVIDED INTO 4 (FOUR) STAGES GIVEN BELOW:
1.    SOLAR-PV AND/OR WIND  ELECTRIC GENERATION, 100 MW AND STORAGE (IN LIQUIDE FORM), FILLING PRESURRIZED TANKS, RAILWAY AND TRAILER LOADING FOR EXPORT.
2.    ALKALI ELECTROLYEZER PACKAGE FOR GENERATION 20,000 Nm3/h (1,800 Kg/h) GREEN HYDROGEN.
3.    FUEL CELL TO CONVERT ENOUGH GREEN HYDROGEN TO ELECTRICITY TO COVER DARK HOURS
4.    GREEN AMMONIA/GREEN UREA. (CAPACITIES NOT DECIDED YET) IT ILL BE GIVEN WITHIN COUPLE OF DAYS.

AFTER PRETY LONG STUDIES WE DECIDED TO USE “ANDRITZ” INDUSTRIAL SCALE ALKALINE ELECTROLYSIS SYSTEM. WE ARE COMMUNICATING WITH THEM TO AGREE ON SYSTEM SPECIFICATION.